Balaclava Road
1930s house, wall removed to gain 700mm, walk-in shower with linear drain. Nineteen working days.
Complete renovations
A full rebuild from the frame out: demolition, plumbing, electrical, waterproofing, tiling and fit-off, run by one crew on one written program. This is the service most Caulfield homes need when the bathroom is original to the house.
The room goes back to bare frame and slab. That is the only honest way to fix falls, hidden leaks and wiring that predates modern safety switches. From there the layout is either kept — because it already works and the money is better spent on finishes — or re-planned to gain usable floor space.
In Caulfield we mostly work with two building types. Interwar and Edwardian houses have timber floors, generous ceiling heights and often a bathroom carved out of a rear verandah, which means bearers and joists get inspected before anything else is priced. Post-war brick homes and walk-up units have concrete floors and shared stacks, so waste positions drive the layout more than taste does. We tell you which constraint you are working with at the first visit.
Benefits
Four outcomes worth the disruption. If a job cannot deliver these, a partial upgrade is the better call and we will say so.
New membrane, correct falls and a tested waste stop water reaching the frame, the slab edge and the room next door.
Wall-hung fittings, a hobless entry and a re-planned door swing typically return half a square metre of clear floor.
Water-efficient tapware, a properly ducted fan and LED circuits cut both the water bill and the mould that follows bad ventilation.
In Glen Eira a dated bathroom is the first thing a buyer prices down. A documented, compliant rebuild removes the argument.
Process
You receive this as a week-by-week program with your quote, including the curing days that cannot be shortened.
Site visit, stack and subfloor check, an honest read on what the room can become.
Laser measure and a fixed itemised price with any provisional sums named.
Layout drawing, tile setout, fixture schedule, selections locked, trades booked.
Strip to frame and slab behind dust barriers, waste removed the same week.
Rough-in for new positions, lighting, fan and heat, inspected before lining.
Membrane to AS 3740, full cure, screed and falls, then wall and floor tiling.
Vanity, pan, tapware, screen, mirror and lighting fitted, grout and silicone finished.
Walk-through, defects closed, compliance certificate and care notes handed over.
Materials & options
These four decisions move a quote further than anything else. We price two of each so the trade-off is visible before you commit.
600×1200 porcelain covers walls quickly with few grout lines. Handmade subway and honed stone take longer to lay and need more setout care. Mosaic shower floors grip better underfoot and cost more per square metre.
A framed screen on a hob is the economical option. A hobless entry with a linear drain looks better, feels larger and needs floor recessing or a raised finished level.
Off-the-shelf wall-hung units suit most rooms. Custom joinery makes sense in odd widths and under sloped ceilings. Stone tops sit above laminate on price and well below it on longevity.
Keeping the toilet and vanity where they are saves real money. Moving a waste on a concrete floor means core-drilling and a different price bracket — sometimes worth it, often not.
Project examples
Full details, before images and materials for each of these sit on the projects page.
1930s house, wall removed to gain 700mm, walk-in shower with linear drain. Nineteen working days.
Two-metre ensuite in a walk-up unit, hobless shower, wall-hung pan, recessed storage. Twelve days.
Plumbing kept in place, freestanding bath under the window, heated towel run relocated. Sixteen days.
Questions
Specific to full rebuilds. General questions are answered on the home page.
No. If the waterproofing is sound, the falls are right and the tiles are simply dated, a partial upgrade — new vanity, tapware, screen and lighting — delivers most of the visual change for a fraction of the cost. We say so at the quote stage rather than selling the bigger job.
Usually yes, within the limits of the waste position. On timber floors we have room to re-route; on a concrete slab, moving a toilet waste means core-drilling and a bigger budget. We price both options so the difference is clear.
Demolition is the loud week. After that the noise drops sharply. Water is off for short, scheduled periods rather than whole days, and we give you those dates in advance.
Yes. We work to the building rules on access hours, lift protection and waste, and prepare the documentation the owners corporation asks for before work starts.
Related services
Not every bathroom needs the full eight stages.
Under five square metres, planned around the door swing and the shower entry.
Base out, falls reset, membrane replaced, new screen measured to the finished tile.
Setout planned on paper, cuts pushed to the corners, grout matched in daylight.
Next step
We reply within one business day with an indicative range, then book a site measure for the fixed price.