BOARD 01 · SURFACES · ROOMS · SUBURBS
One trade board for the whole job: tiles and stone chosen first, then the room, then the suburb, then a written quote.
HOME · SERVICES · FULL BATHROOM RENOVATIONS
Strip-out to handover on a single room: plumbing and electrical rough-in, waterproofing, tiling, joinery, screens and finishing, run in the order that keeps the trades from tripping over each other.
SCOPE · WHAT IS INCLUDED
Protection of the access path and floors
Strip-out and waste removal
Framing and substrate corrections
Plumbing and electrical rough-in to the drawings
Waterproof membrane with cure time allowed
Wall and floor tiling, set out from the focal wall
Vanity, mirror or shaving cabinet, niche shelving
Shower screen and door hardware
Tapware, wastes and toilet suite fit-off
Exhaust, lighting and switching
Silicone, paint touch-up and door furniture
Final clean and a walk-through at handover
Anything outside this — moving a wall, re-routing a stack, structural repair found during strip-out — is priced as a written variation before the work happens.
MATERIALS · DESIGN OPTIONS
Tile format sets the joint grid and the number of cuts. A 600×1200 porcelain reads calm but needs a flat wall; a smaller handmade-look tile hides movement but doubles the setting time.
Benchtops run from laminate through engineered surfaces to natural stone, each with different edge details and sealing needs. Tapware finish — chrome, brushed nickel, matte black, brushed brass — is chosen last so the whole set matches across mixer, rail, waste and accessories.
Consultation, assessment, design, quote, materials, demolition, rough-in, waterproofing, tiling, fixtures, finishing, handover.
Ensuites, small bathrooms, walk-in showers, tiling, waterproofing, vanity installation and laundry renovations run off the same board.
Caulfield, Caulfield North, South and East, Malvern East, Carnegie, Glen Huntly, Ormond, Elsternwick, Bentleigh and St Kilda East.
Membrane goes on in coats with cure time between them, and the corners, junctions and pipe penetrations are detailed separately. Waterproofing of domestic wet areas in Australia is set out in AS 3740, and tiling cannot start until the membrane is done properly.
Usually yes, within limits set by the waste position, the stack and the floor structure. Moving a toilet is the most expensive change; moving a basin or shower head is often straightforward. That is decided at the assessment stage, before the quote.
Rot, old lead waste or unstable substrate is not always visible beforehand. It gets photographed, explained and priced as a variation you approve in writing before we continue.
You choose a level — the quote carries a stated allowance for tile, tapware and joinery — then final selections are locked in at the materials stage and the allowance is adjusted up or down against the real cost.
Name, phone, email, suburb, bathroom type, budget range, timeframe, a short description and photos. That is everything needed to start.